YESSEAM CONTACT US

The Activewear Sampling Guide

Your sample is the one chance to fix problems before you spend on bulk. Here's how sampling works and exactly what to check before you approve.

Quick answer: Expect a development sample in 7–10 days for ~US$30–80, and budget for 1–2 rounds. Never approve bulk until a physical sample passes fit, opacity, wash and construction checks.

In-line quality check against the spec sheet
In-line quality check against the spec sheet

Types of samples

Cost & lead time

Around US$30–80 per style, 7–10 days (often credited against your bulk order). Plan for 1–2 iterations to nail fit — that's normal, not a red flag.

How to evaluate a sample (checklist)

Give feedback that gets results

Be specific and measured: "waistband 2cm too low", "fabric too thin at seat, go heavier GSM", with photos. A good factory iterates fast on clear notes.

Development sample: seamless halter set
Development sample: seamless halter set

The sampling timeline, day by day

A realistic seamless sampling loop runs 7–10 working days from confirmed spec to sample in your hands. Days 1–2: yarn allocation and machine programming — the knit map for your size and compression zones is written into the circular machine. Days 3–4: knitting and linking; a seamless garment comes off the machine as a tube and is linked, not sewn panel-to-panel. Days 5–6: dyeing to your lab-dip approval, then finishing and heat-setting, which locks the final dimensions. Day 7: in-house measurement against the spec sheet, photos, and courier pickup. International shipping adds 3–5 days door-to-door.

Multiply that loop by rounds: most brands need two fit rounds before bulk, three if the style is new to their fit block. Budget 4–6 weeks total for sampling on a first collection and you will rarely be surprised — the lead-time guide shows how sampling overlaps bulk scheduling.

How to read your first fit sample

When the parcel arrives, resist the urge to judge by look alone. Work through this order: first, measure every point of measure (POM) on the spec against the garment lying flat — waistband relaxed, inseam, rise, underband. A seamless garment should land within ±1.5 cm on major POMs. Second, stretch recovery: pull the waistband to full extension, release, and measure again after ten minutes; more than 2 cm of growth signals the wrong spandex ratio. Third, put it on a real body — the target size wearer, not a mannequin. Squat, sit, reach overhead. Check opacity in daylight, waistband roll, and where seams sit on the shoulder and hip.

Photograph problems flat AND worn, circle them, and send one consolidated comment sheet. Factories work best from a single numbered list per round.

The mistakes that add whole extra rounds

Three habits burn sampling time. Changing multiple variables at once — new fabric AND new length AND new waistband in round two — makes it impossible to attribute what worked; change systematically. Approving from photos or video instead of the physical garment; screen colors lie and hand-feel does not travel through a lens. And skipping the wearer trial: a garment that measures perfectly can still ride, dig or gap in motion, and finding that out in bulk is a five-figure lesson. One extra day of wear-testing per round is the cheapest insurance in this industry.

Sample costs and how the money works

Sampling is charged per style at most seamless factories, with the fee typically credited back against your bulk order — so a serious buyer effectively samples free. Lab dips for custom colors are quoted separately, and courier cost sits with the buyer. What should make you cautious is a factory that charges nothing at all up front: sampling consumes real machine time, and a factory that gives it away usually recovers the cost somewhere less visible. Full details on how we structure it are on the pricing & MOQ page.

Lab dips and strike-offs: the color loop

Custom colors run on their own approval track, parallel to fit. A lab dip is a small dyed swatch of your actual fabric matched to a Pantone TCX code — expect 2–3 options per color (light/on/dark side of the standard) in 5–7 days. Approve under D65 daylight and store light both, because knit fabrics metamerise: a perfect match under office LEDs can drift green in daylight. For prints, the equivalent is a strike-off — your artwork on the real fabric at production settings. Approve dips and strike-offs in writing before bulk fabric is dyed; color is the one thing that cannot be fixed after the fact.

The three-sample system professionals use

Fit sample: made to prove the pattern and measurements — often in available fabric or color, judged only on fit. Pre-production (PP) sample: made from bulk fabric, bulk trims, approved colors — this is the golden sample your inspection will compare against, so sign and keep one of each size you sell. Shipment (TOP) sample: pulled from the actual bulk run before packing, confirming production matched the PP standard. Brands that collapse these into one sample save a week and routinely lose a season. The PP sample in particular is your legal and practical anchor for the AQL inspection.

FAQ

How much does a clothing sample cost?

Around US$30–80 per style for activewear, usually credited against your bulk order, with a 7–10 day lead time.

How many sample rounds should I expect?

Typically 1–2 rounds to finalise fit and details. Complex styles may need more.

Get a sample in days, not weeks.

Development samples in 7–10 days, iterated until the fit is right. Start with a free swatch pack. MOQ 100.

REQUEST A SAMPLE →

Related reading

GET A QUOTE WHATSAPP